2007
SUPPLIER AUDIT REPORT

1. COMPANY PROFILE
Company Name: Robert McKeown Company,
Inc.
Address: 111 Chambers Brook Road / Branchburg, NJ 08876
Phone: (908) 218-9000
Fax: (908) 218-8949
Management Officials Name: / Position:
Dawson K. McKeown, President
Carmen Gerrone, General Manager
Jeffrey Vozzo, Quality Manager
Theresa
Graziano, Inside Sales Manager
Type of Manufacturing, Service, or Products/Applicable Specifications:
Distributor/Fabricator
of Engineered Materials for
Electronic Assembly, including Circuit Protection, Thermal Management and EMI/ESD
Suppression Products for High Technology Electrical Applications.
Years in business under current name/ownership: 70
Total plant area sq. ft.: 15,000
Type of buildings: (2-story, metal / brick)
Employee breakdown:
Management: 7 Engineering:
1 Purchasing: 1 Sales: 9
General Office: 3 Production: 5
Quality Control: 5 Other: 2
Total number of employees: 26, plus 2 temp
Work Schedule:
8 Hour shift M - F ( 8:30am - 5:00PM)
Condition of equipment: GOOD
Report prepared by: Carmen Gerrone
Title: General Manager
Date: 2/09/07
2. QUALITY CONTROL ORGANIZATION
Name: Jeffrey Vozzo
/
Title: Operations Controller
/ Quality Controller
Organization chart.
The quality control department reports to: Name: /
Position: Carmen Gerrone, General Manager
Other functions reporting at the same level are:
Operations, Accounting and Billing Administration
Yes / No / N/A
Does the quality department have:
Written quality policy and procedures manual? YES
Written inspection instructions? YES
A quality audit function? YES
A gage control program? YES
A gage control laboratory? N/A
A quality cost program? N/A
Who is responsible for analyzing customer complaints and goods returned for defective quality?
Quality Manager
Does the quality department use statistical tools (control charts, sampling plans, etc.)?
We use charts and graphs to analyze performance trends.
What is the company's policy regarding the period for which inspection records are maintained? Samples?
3 Years
What special inspection equipment or processes does the company offer? N/A
Is the quality control laboratory function accredited by any organization?
N/A
3. CONTROL OF PURCHASED MATERIAL
Yes /
No / N/A
Are purchase orders made available to incoming inspection? YES
Is there a system for keeping shop drawings up-to-date? YES
Is sample inspection used? YES
Is gagging equipment calibrated periodically? YES
Is gagging equipment correlated with suppliers' equipment? YES
Are
records kept to show acceptance and rejection of incoming material? YES
Does the company have an approved supplier list? YES
Does the company conduct quality surveys of supplier facilities? NO
Is nonconforming material identified as such? YES
Is nonconforming material held in a specific area until disposition can be made?
YES
Are drawing changes made available to incoming inspection? YES
Are physical and chemical test reports of materials checked to assure they conform to specifications?
N/A
Are vendor rating systems or other forms of supplier performance reports available to the purchasing department?
YES
Does the company ensure complete trace ability of lots through all operations? YES
Who is responsible for making disposition of nonconforming material? QA
4. DESIGN CONTROL
Yes /
No / N/A
Does the company have a written system for incorporating customer changes? YES
Does quality control review new products before manufacturing? YES
Do drawings and specifications accompany purchase orders to suppliers? Only
when required and within terms of Non-Disclosure Agreements.
Are these reviewed by quality control? YES
Are characteristics classified on the engineering documents as to importance? YES
Does quality control review new drawings with the intent of designing gagging fixtures?
N/A
Does the company have a system in place to ensure that no changes to the product design or quality requirements will occur without customer approval?
YES
5.0 PROCESS CONTROL
Yes /
No / N/A
Is in-process inspection utilized? YES
Is final inspection utilized? YES
Are shop drawings and specifications available to inspection? YES
Is there a system for keeping documents up-to-date? YES
Are some form of control charts in use? NO
Are written inspection instructions available?
YES
Is there a system for reviewing and updating inspection instructions? YES
Is sample inspection used? YES
Are production workers responsible for the quality of their own work? NO,
Cross inspection is utilized.
Are inspection records kept on file? YES
Is inspection equipment calibrated periodically? YES
Is all material identified and traceable? YES
Is defective material identified as such? YES
Is defective material segregated from good material until disposition is made? YES
Are set-up parts inspected before a job can be run? YES
Is corrective action taken to prevent the recurrence of defective material? YES
Who is responsible for making disposition of none conforming material? QA
6. MAINTENANCE OF INSPECTION EQUIPMENT
Yes /
No / N/A
Does the company have written instructions for operating inspection and test instruments?
YES
Does the company have written procedures for the control, calibration, etc. of measuring and test equipment?
YES
Are all inspection instruments calibrated at periodic intervals? YES
Are records of calibration and maintenance kept on file? YES
Does the system include instruments used by production? YES
Are the inspection instruments used by production calibrated? YES
If so, are these instruments calibrated periodically? YES
Do employees personally own inspection instruments which they use to inspect the product?
NO
If so, are these instruments calibrated at periodic intervals?
N/A
Are defective inspection instruments removed from use until they can be repaired or recalibrated?
YES
Are shop masters calibrated at periodic intervals to secondary standards traceable to
NIST? YES
7. PACKAGING AND STORAGE
Yes /
No / N/A
Are
packaging and labeling instructions readily available? YES
Are materials adequately packaged to prevent damage during handling and shipping?
YES
Are cartons clearly identified as to contents? YES
Are cartons containing perishable material date-stamped? YES,
Shelf-Life indicated.
Are materials removed if the expiration date has been reached? YES
Are aisles or storage areas clear of obstructions? YES
Is material stored in such a manner that it presents no safety or fire hazard? YES
Is stored material exposed to harmful environments? NO
Are materials that are subject to deterioration inspected periodically? YES
Are only authorized personnel allowed to remove material from storage? YES
Are only authorized personnel allowed to return material to storage? YES
Does the company ensure that all individual inspection lots are kept separate? YES
8. MANAGEMENT INTENT
Yes /
No / N/A
Does the quality control department report at a level equal to production, engineering, and purchasing?
YES
Does the quality control manager participate in top management meetings and decisions?
YES
Is the quality control manager encouraged to attend trade shows and technical conferences?
NO
Are quality control personnel encouraged to broaden their perspective by joining technical societies or by engaging in community activities?
NO
Does the quality control department provide scrap, rework, or other pertinent information to top management?
YES
Does top management take any action based on these reports? YES
Does the company offer training programs to quality personnel? YES
Does the company offer training programs to production personnel? YES
Are inspection or production personnel below the supervisory level permitted to make policy decisions concerning quality?
May submit suggestions for Quality improvement.
Does the inspection area reflect good, clean working conditions? YES
Does the company have a written system for incorporating customer changes? YES
Does the company encourage employee involvement in a continuous improvement program?
YES
What has been your most significant Continuous Improvement achievements during the last twelve months?
Continuously, business transactions are in the process of being
compiled to excel worksheets to chart and graph performance trends in key areas
to expose problems that will require corrective action to bring about
improvement. We will be implementing a new ERP software that will enhance
our business protocols, improving efficiency and productivity. We expect
this upgrade to be complete by May 2007.
Briefly describe your Continuous Improvement program. Management
meetings are periodically scheduled to review operations and logistics and
discuss actions that would bring about improving current conditions. We continually
look for upgrades to the way we approach our business affairs.
Customer Approval Signatures:
President:
Vice President:
Q.C. Manager:
Comments:
QA-2007
CG97